top of page
1 copy.png

Linkbridge at Shui Chuen O Estate, Phase 3 - PRH Development at Shatin

Shatin

Linkbridge at Shui Chuen O Estate, Phase 3 - PRH Development at Shatin

Shatin

The Linkbridge at Shui Chuen O Estate Phase 3 is an essential pedestrian infrastructure designed to enhance connectivity within the estate and surrounding areas. Developed as part of the Public Rental Housing (PRH) project, the bridge provides a seamless link between different phases of Shui Chuen O Estate and nearby facilities. The two-story podium integrates with existing rock slopes to minimise environmental impact while ensuring accessibility. The bridge connects to parks and green spaces, offering residents a convenient passage to recreational areas.

Additionally, the 73-meter-long pedestrian footbridge and 50-meter-high lift tower serve as the main entrance to the estate, facilitating movement between Shui Chuen O Street and other key locations.

Project Type

Public Housing

Completion Year

2017

Client

Hong Kong Housing Authority

GFA

Award

Linkbridge at Shui Chuen O Estate, Phase 3 - PRH Development at Shatin

Shatin

The Linkbridge at Shui Chuen O Estate Phase 3 is an essential pedestrian infrastructure designed to enhance connectivity within the estate and surrounding areas. Developed as part of the Public Rental Housing (PRH) project, the bridge provides a seamless link between different phases of Shui Chuen O Estate and nearby facilities. The two-story podium integrates with existing rock slopes to minimise environmental impact while ensuring accessibility. The bridge connects to parks and green spaces, offering residents a convenient passage to recreational areas.

Additionally, the 73-meter-long pedestrian footbridge and 50-meter-high lift tower serve as the main entrance to the estate, facilitating movement between Shui Chuen O Street and other key locations.

Project Type

Public Housing

Completion Year

2017

Client

Hong Kong Housing Authority

GFA

Award

Linkbridge at Shui Chuen O Estate, Phase 3 - PRH Development at Shatin

Shatin

The Linkbridge at Shui Chuen O Estate Phase 3 is an essential pedestrian infrastructure designed to enhance connectivity within the estate and surrounding areas. Developed as part of the Public Rental Housing (PRH) project, the bridge provides a seamless link between different phases of Shui Chuen O Estate and nearby facilities. The two-story podium integrates with existing rock slopes to minimise environmental impact while ensuring accessibility. The bridge connects to parks and green spaces, offering residents a convenient passage to recreational areas.

Additionally, the 73-meter-long pedestrian footbridge and 50-meter-high lift tower serve as the main entrance to the estate, facilitating movement between Shui Chuen O Street and other key locations.

Project Type

Public Housing

Completion Year

2017

Client

Hong Kong Housing Authority

GFA

Award

bottom of page